Mon-Sun 9:00 am - 6:00 pm
0

Equipment Supply, Delivery & Installation Terms

Effective Date: November 1, 2026

Prepared in consultation with legal counsel

Commercial equipment purchases require coordination between equipment delivery, site preparation, installation, and staff onboarding. Please review the following requirements before confirming your order.

Equipment Delivery, Pickup & Installation Timing

Once purchased equipment is available and you are notified that it is ready, delivery, pickup, or installation should normally be completed within 3–5 business days, unless another schedule has been agreed in writing.
If the customer is not ready to receive or install the equipment within that period, the equipment may need to be moved to a later delivery or installation schedule based on technician availability, warehouse capacity, and incoming equipment.
Additional storage, re-delivery, or rescheduling charges may apply when delays are caused by site readiness or customer scheduling.

Site Readiness
The installation area must be fully prepared before the scheduled installation date.
Unless specifically included in your written quote, equipment installation does not include:
  • Plumbing construction or modification
  • Electrical wiring or circuit installation
  • Drain installation or modification
  • Counter cutting or structural work
  • Cabinet or millwork modification
  • Wall penetration
  • Floor work
  • Heavy construction
  • Permit work
  • Moving unrelated equipment or furniture
For plumbed espresso equipment, the customer is responsible for having the required water supply, shutoff valve, drain connection, electrical service, and counter openings completed before our technician arrives.

The water connection should normally be located within 6 feet of the machine installation point, unless another arrangement has been approved in advance.
The drain outlet must be accessible and properly prepared to accept the equipment drain line.
Electrical outlets and circuits must match the requirements of the equipment being installed.

Additional Installation Work

If your project requires work beyond the standard installation scope, please provide all relevant information before the installation date.

We may request photos, floor plans, counter drawings, utility locations, equipment specifications, and contractor information as needed.

Unexpected site conditions or additional work requested on the installation day may result in:
  • Additional labor charges
  • Additional materials charges
  • Rescheduling
  • A separate service visit
  • Cancellation of the installation until the site is properly prepared
Installation Cancellation / Site-Not-Ready Fee
A $350 installation cancellation or rescheduling fee may apply when:
  • A confirmed installation is canceled after scheduling
  • Our technician has already been dispatched
  • The customer or authorized representative is unavailable
  • Required utilities are not ready
  • The counter or installation area is not prepared
  • Site conditions prevent the equipment from being safely installed
Any additional travel, freight, labor, or third-party costs incurred may be charged separately.

Complimentary Initial Equipment Setup

When included with the equipment purchase, initial equipment setup is provided at no additional charge.
Complimentary setup is subject to:
  • Site readiness
  • Equipment accessibility
  • Technician availability
  • Installation being completed as scheduled
  • The equipment being installed in accordance with manufacturer requirements
If setup cannot be completed because the site is not ready, utilities are unavailable, or the scheduled appointment cannot proceed for reasons outside our control, the complimentary setup may be forfeited or rescheduled as a paid service.

Complimentary Initial Barista Training

When included with the equipment purchase, we provide an initial barista training session at no additional charge.

Training is intended as an initial operational introduction to the equipment and may include basic machine operation, grinder adjustment, espresso preparation, cleaning procedures, and workflow guidance.
Training must be scheduled within the agreed project timeframe and requires the equipment to be fully installed and operational.
If training cannot take place because staff is unavailable, the site is not ready, or the appointment is canceled or postponed by the customer, a future training session may be subject to an additional charge.

Warranty

Equipment warranty coverage is governed by the applicable manufacturer warranty terms, including eligibility, duration, exclusions, required maintenance, and service procedures.

Installation, setup, training, delivery, or scheduling delays do not modify or extend the manufacturer's warranty unless explicitly stated in writing.

Warranty coverage generally does not include problems caused by:
  • Improper installation by others
  • Incorrect electrical supply
  • Improper water pressure
  • Inadequate water filtration
  • Scale or water-quality damage
  • Drainage problems
  • Misuse or operator error
  • Failure to follow required cleaning or maintenance procedures
  • Unauthorized modifications or repairs
  • Damage occurring after delivery
Customers should retain all purchase and warranty documentation.

Water Quality & Filtration

Commercial espresso and coffee equipment requires appropriate water quality.
The customer is responsible for providing suitable water treatment where required.
Damage caused by scale, unsuitable water chemistry, inadequate filtration, or failure to replace filtration cartridges may not be covered under the manufacturer's warranty.
Water testing or a specific filtration system may be recommended before installation.

Equipment Access

The customer must ensure that the equipment can physically reach the installation location.
Please confirm in advance:
  • Door widths
  • Hallways
  • Elevators
  • Stairs
  • Loading areas
  • Counter dimensions
  • Installation clearances
  • Access for future service
Special handling, stairs, difficult access, lifting equipment, or additional personnel may result in additional charges.

Inspection at Delivery

Commercial equipment should be inspected promptly upon delivery.
Document any visible shipping damage, missing items, or packaging damage immediately with photographs, and report it as soon as possible.
Do not discard packaging until the equipment has been inspected and accepted.

Final Site Confirmation

If you are unsure whether your site is ready, contact us before the scheduled installation date.
Send photographs, drawings, measurements, electrical information, water and drain locations, or any other details that may affect the installation.
  • Identifying an issue before the installation appointment is usually significantly easier and less expensive than discovering it after the technician arrives.